Dad's Club School Beautification Day
Sat, Dec 3 7:30am-2:00pm
Communications
1 day before, 7 days before

 

Calling all Sunset View Dads!  Bring your blowers, brooms and brushes and come alongside some other rad dads of SVE on Saturday, December 3rd between 8am and 1:30pm for a day of campus beautification.  We have a number of projects to help cross off the school's list that vary in  required skill and ability - - - rest assured, there will be something for everyone and every little bit will help!

The day will be split between two shifts (8-11am and 10:30 to 1:30pm) and we will have three primary working groups:

  1. Clean-up (primarily 1st shift)
  2. Painting (primarily 2nd shift)
  3. Construction (wood bench installs, window replacement, etc).

For a more detailed list of items, click here.

 

Choose which shift you'll join us for and what tools (if any) you're able to provide day of.  

 

Feel free to reach out to AJ Pitkin directly with any questions or needs.  


Jobs

Morning Shift #1 Signed Up: 4 / 40

Sat, Dec 3 8:00am-11:00am
The first shift will primarily focus on blowing/sweeping under all benches and blacktops, pulling weeds, cleaning rain gutters, raking leaves, etc. The second shift will primarily focus on repainting all lines (hopscotch, whales, USA map, etc.) on the blacktops across campus. Either shift can help with the various construction items (bench/window installs and lock replacement).
Sign up

Morning Shift #2 Signed Up: 4 / 40

Sat, Dec 3 10:30am-1:30pm
The first shift will primarily focus on blowing/sweeping under all benches and blacktops, pulling weeds, cleaning rain gutters, raking leaves, etc. The second shift will primarily focus on repainting all lines on the blacktops across campus. Either shift can help with the various construction items (various bench/window installs).
Sign up

All Day Signed Up: 0 / 10

Sat, Dec 3 7:30am-2:00pm
The first shift will primarily focus on blowing/sweeping under all benches and blacktops, pulling weeds, cleaning rain gutters, raking leaves, etc. The second shift will primarily focus on repainting all lines on the blacktops across campus. Either shift can help with the various construction items (various bench/window installs).
Sign up